![]() | OFFSHORE PLATFORMS & FLOATERS AND MOORING SYSTEMS | T084-EN009 | ||
REVISION 07 | STATUS C | ![]() |
![]() |
07 | 23/09/19 | JCM | Approved | VLE | VLE | - | HEK |
06 | 14/06/19 | JCM | Approved | VLE | VLE | - | HEK |
05 | 15/02/19 | JCM | Re-Issued for Approval | VLE | VLE | - | - |
04 | 12/02/18 | GCO | Approved | ABG | AAL | BCA | - |
03 | 16/11/07 | GCO | Issued For Approval | ABG | AAL | BCA | - |
02 | 02/10/07 | ABG | Issued For Approval | GCO | AAL | BCA | - |
01 | 27/08/07 | ABG | Issued For Comments | GCO | AAL | BCA | - |
00 | 10/08/07 | ABG | Internal Check | GCO | AAL | - | - |
Rev. | Date | Issued by | Revision memo | Checked by | Approved by | ||
---|---|---|---|---|---|---|---|
Engineer approval | Total approval |
Contents
List of Figures
- 3.1. Shell’s Bullwinkle Platform under tow to installation site
- 3.2. Deepwater Fixed Platforms Overview (Offshore Magazine)
- 3.3. Amerada Hess ‘’Balpate’’ Compliant Tower
- 3.4. Compliant Towers Overview (Offshore)
- 3.5. Truss SPAR General Arrangement
- 3.6. Classic SPAR General Arrangement
- 3.7. Truss SPAR General Arrangement
- 3.8. Cell SPAR General Arrangement
- 3.9. Existing SPARs - Offshore Magazine Poster (2018 status)
- 3.10. Turret Moored FPSO General Arrangement
- 3.11. Girrasol FPSO (Spread, Angola)
- 3.12. KAOMBO NORTE FPSO (Internal Turret, Angola)
- 3.13. EGINA FPSO (Spread, Nigeria)
- 3.14. MOHO NORD FPU with its TLP (Spread, Congo)
- 3.15. FDPSOs from MURPHY EP (Spread, Congo)
- 3.16. PRELUDE FLNG from SHELL (Turret, Australia)
- 3.17. Okume TLP – Trident Engergy (Equatorial Guinea)
- 3.18. Schematic of the Mars TLP – SHELL
- 3.19. Ursa TLP – Modules Installation – SHELL (GoM)
- 3.20. MOHO NORD TLP – TOTAL (Congo)
- 3.21. MOHO NORD TLP SIMOPS– Schematics
- 3.22. Mattherhorn Mini-TLP (GoM)
- 3.23. Typhoon Mini-TLP – CHEVRONTEXACO/BHPBILLITON (GoM)
- 3.24. Ichthys Semi-Submersible wet tow – INPEX (Australia, 250m WD)
- 3.25. Thunder Horse Semi-Submersible transportation – BP (GOM)
- 3.26. Converted Semi-Submersible FPS – PETROBRAS (Brazil)
- 3.27. SSP Piranema - PETROBRAS
- 3.28. SSP Piranema Tanks - PETROBRAS
- 3.29. SSP Piranema Bilge Box – PETROBRAS
- 3.30. Sevan floating facilities (2016)
- 3.31. INDEPENDENCE HUB Deep Draft Semi
- 3.32. AKER Deep Draft Semi (DDSS)
- 3.33. TECHNIP Extended Draft Platform (EDP)
- 3.34. OffshoreTech LLC (OTL) TCDD-Semi Concept
- 4.1. Deepwater Floater Concepts Relative Heave in Waves Response
- 4.2. Floater Choice (dry or wet trees) versus Reservoir Geometry Criteria
- 4.3. Typical TLP Design Cycle
- 4.4. Water Depth Range Comparison by Deepwater Production Type (by Courtesy of Offshore Mag.)
- 4.5. Throughput Capacity Ranges by Deepwater Production Type (by Courtesy of Offshore Mag.)
- 4.6. Well Capability by Deepwater Production Type - Includes Production & Water Injection Wells (by Courtesy of Offshore Mag.)
- 5.1. Samsung Heavy Industries – Geoje Shipyard (South Korea)
- 5.2. Hyundai Heavy Industries Co. Ltd. (South Korea)
- 5.3. Technip Mantyluoto (SPAR) Shipyard Pori (Finland)
- 5.4. Typical FPSO Execution Schedule (see notes)
- 5.5. Typical FPSO Execution Schedule (see notes)
- 5.6. Typical TLP Execution Schedules (see notes))
- 5.7. Typical Semi-Submersible Execution Schedule (see notes)
- 5.8. Typical SPAR Execution Schedule (see notes)
- 5.9. Dockwise ‘Vanguard ’ – MOHO NORD FPU Transportation
- 5.10. Dockwise ‘Mighty Servant 1’ – Thunder Horse Semi-Submersible Transportation
- 5.11. Jumbo ‘J1800 class’
- 5.12. Heerema Thialf
- 5.13. Heerema Balder
- 5.14. Saipem 7000
- 5.15. DB50 – McDermott
- 6.1. Deepwater mooring configurations
- 6.2. FPU typical Spread Mooring System
- 6.3. Dry termination system
- 6.4. Underwater fairleads and dry stoppers
- 6.5. Underwater Fairleads and Chain Stoppers
- 6.6. Bending shoes + winch deck arrangement
- 6.7. Bending shoes
- 6.8. Bending shoes + chain jack deck arrangement
- 6.9. UCSF + winch
- 6.10. UCSF + windlass
- 6.11. Uni-Joints – Design
- 6.12. Uni-Joints – design – IHC Assembly
- 6.13. Inline Mooring Tensioner – SBM
- 6.14. Catenary Moorings
- 6.15. Multi-Catenary Mooring incorporating subsea buoys
- 6.16. Taut Spread Mooring
- 6.17. Tendon System Description
- 6.18. Moho Nord TLP Tendon Configuration
- 6.19. Definition of TLP Offset and Set-down
- 6.20. External Turret (Libra FPSO on the bottom)
- 6.21. Internal Turret – Kaombo Norte and Marlim Sul FPSOs
- 6.22. RTM Mooring System (by Courtesy of SBM)
- 6.23. BTM Mooring System (by Courtesy of SBM)
- 6.24. BTM Mooring System – Turritella FPSO (SHELL, GOM)
- 6.25. Submerged Turret Production system (STP) Connect & Disconnect Sequences
- 6.26. Initial Position of the Vessel in Equilibrium without Environmental Forces
- 6.27. Equilibrium Position of the Vessel under the Action of Beam Seas Mean Environmental Forces
- 6.28. Chain Link (by Courtesy of Vicinay Cadenas)
- 6.29. Wire Construction Types
- 6.30. Spiral Strand Wire Rope Mechanical Characteristics (typical)
- 6.31. Superline Steelite Xcel Elongation Plots (by Courtesy of Marlow Ropes)
- 6.32. Dyneema Rope Characteristics (by Courtesy of Marlow Ropes)
- 6.33. Chain Connector Plate to Wire or Synthetic Mooring Lines
- 6.34. Fluke Anchor Components
- 6.35. Main Fluke Anchor Types
- 6.36. Drag Embedment Fluke Anchor (Bruce Flatkluke)
- 6.37. Bridle Arrangement
- 6.38. Rigid Shank Arrangement
- 6.39. Suction Caisson Anchor (deployment from AHT deck)
- 6.40. Sea bed trenching in front of suction piles
- 6.41. Anchor Pile & Hammer
- 6.42. Torpedo anchor
- 6.43. Hurricanes & Typhoons Paths - Wordlwide
- 6.44. FPSO Munin in Full DP Mode (Bluewater)
- 6.45. Seillean, a DP Class-2 FPSO operating in up to 2,000-m Water Depth (Brazil)
- 6.46. Haewene Brim DP FPSO (Bluewater)
- 7.1. The Dalia Buoy based on the APL's BTL system (see Section Section 7.1.3, “Turret Buoys”)
- 7.2. CALM Buoy Concepts
- 7.3. CALM Buoy Detailed Description (typical)
- 7.4. Girassol CALM Buoy (Total, WoA)
- 7.5. Ehra CALM Buoy (ExxonMobil, WoA)
- 7.6. The APL's Buoy Turret Loading (BTL) system
- 7.7. The EGINA BTL general and internal turret views
- 7.8. HiLoad Offloading System Overview
- 7.9. Connection Sequence
- 7.10. Typical Offloading System Overview
- 7.11. HiLoad Scale Model Testing
- 7.12. HiLoad tandem offloading
- 7.13. CTV principle
- 7.14. Total's Girassol offloading system – buoyancy module and buoy details
- 7.15. Dalia Export Lines Nominal Configuration
- 7.16. Ehra Export Lines Nominal Configuration
- 7.17. PAZFLOR OOL’s Gimble table Installation